January 19, 2011 - Today the geotechnical team was here boring holes to determine where the bedrock is and how much excavation will be needed. Thankfully the bedrock is between 7 and 15 feet down and will not be a big problem for us. Stay tuned for further updates on the building program. If all continues to go well we may be turning some dirt over very soon!!!